2025
Compact backup power solution for office infrastructure within an energy company
The 150 kW / 470 kWh system incorporates a high-speed static transfer switch (STS) and a proprietary energy management system for uninterrupted transition of critical loads during power disturbances
LOCATION
Kaspiysk, Republic of Dagestan, Russia
CLIENT
RusHydro PJSC
Dagestan Branch
PROJECT
FEATURES
The BESS delivers backup power for critical office infrastructure at the branch headquarters, including server systems, lighting, workstations, office equipment, and security systems.
A high-speed Static Transfer Switch (STS) is integrated into the system to ensure seamless transition between grid supply and battery-backed operation.
System monitoring and control are implemented via a proprietary automation and control system (ACS) based on domestically developed hardware and software platforms.
[ backup power supply ]
[ office infrastructure ]
[ high-speed STS ]
[ LFP batteries ]
PROJECT
FEATURES
The BESS delivers backup power for critical office infrastructure at the branch headquarters, including server systems, lighting, workstations, office equipment, and security systems.
A high-speed Static Transfer Switch (STS) is integrated into the system to ensure seamless transition between grid supply and battery-backed operation.
System monitoring and control are implemented via a proprietary automation and control system (ACS) based on domestically developed hardware and software platforms.
[ backup power supply ]
[ office infrastructure ]
[ high-speed STS ]
[ LFP batteries ]
DETAILS
SYSTEM TECHNICAL SPECIFICATIONS

SPECIFICATION

VALUE

Rated Power, KW

150 (165)

Rated Energy Capacity, kwh

470

Nominal Connection Voltage (POI), kv

0,4

Nominal Frequency, hz

50 / 60

Installation Type

Indoor cabinet-type installation

Cooling System

Air cooling (HVAC + supply/exhaust ventilation)

BMS TYpe

Passive, active, 3-level

Battery Type

Lithium Iron Phosphate (LFP)

Max Charge Rate

1 С

Max Discharge Rate

1 С

Cycle Life, cycles

6000

Battery Configuration

2 clusters, 1P240S

Nominal DC Bus Voltage

768

Power Conversion System

Bidirectional voltage converter with isolation transformer

Maximum PCS Efficiency

97,1 %

Total Harmonic Distortion (THD)

≤ 1% for linear loads
≤ 5% for nonlinear loads

Overload Capability

110 % continuous operation
Share your project requirements with us, and our experts will contact you shortly.
Download and complete the Project Сhecklist
and email it to: info@voltsbattery.com