2025
15 MW Industrial Solar Power Plant with Excess Energy Storage
2.2 MWh Battery Energy Storage System (BESS)
for load compensation and improved utilization of solar generation
LOCATION
SAUDI ARABIA
DEVELOPER
Subcontractor
PROJECTS DETAILS
FEATURES
The project site is located in Al Ajban, near Saih Al Khair, Abu Dhabi.
The power plant is situated within the fenced premises of the client’s facility.
The proposed 15 MW power plant offsets the facility’s energy consumption for the Ministry of Defense and stores excess generation in a battery energy storage system (BESS).
Scope of Work
  • Front-End Engineering Design (FEED) of the solar PV plant and battery energy storage system (BESS), including electrical and civil engineering solutions
  • Load and generation balancing, aligning energy production with projected demand and the BESS charge/discharge schedule
  • PVsyst simulations to determine the optimal configuration of the solar PV plant
[ hybrid energy system ]
[ energy consumption optimization ]
[ renewable energy integration ]
DETAILS
CORE TECHNICAL SPECIFICATIONS

PARAMETER

VALUE

Solar PV Plant Capacity, kw

15 000

BESS Energy Capacity, kwh

2200

Nominal Connection Voltage (POI), kv

0,8

Nominal Frequency, hz

50

Installation Type

Outdoor, UHL1

Cooling System

Air cooling (HVAC + supply/exhaust ventilation)

Battery Type

Lithium Iron Phosphate (LFP)

Max Charge Rate

0,5 С

Max Discharge Rate

1 С

Nominal DC Bus Voltage, V

768

Power Conversion System

High-frequency modular bidirectional converter with isolation transformer

Maximum PCS Efficiency

96,1%

Total Harmonic Distortion (THD)

2%

Overload Capability

105–115% — 10 min
115–125% — 1 min
125–150% — 200 ms