2024
Peak Demand Charge Reduction
During System Peak Hours
Containerized Battery Energy Storage System (250 kW / 355 kWh)
with load forecasting and automated dispatch during anticipated peak demand periods
Location
Russia, Pushkin
Client
Rosseti Lenenergo
Southern Electric Networks
PROJECT
Features
A Battery Energy Storage System (BESS) reduces demand charges for consumers connected under the third tariff category.
The economic benefit is achieved by offsetting grid power consumption during forecasted peak demand hours (maximum aggregated load).
Peak demand hours are forecast using proprietary software based on historical data.
The system incorporates load feedback control to prevent reverse power flow to the external grid.
[ demand charge optimization ]
[ peak load prediction ]
[ containerized architecture ]
[ LFP batteries ]
Проект
Features
A Battery Energy Storage System (BESS) reduces demand charges for consumers connected under the third tariff category.
The economic benefit is achieved by offsetting grid power consumption during forecasted peak demand hours (maximum aggregated load).
Peak demand hours are forecast using proprietary software based on historical data.
The system incorporates load feedback control to prevent reverse power flow to the external grid.
[ demand charge optimization ]
[ peak load prediction ]
[ containerized architecture ]
[ LFP batteries ]
DETAILS
SYSTEM TECHNICAL SPECIFICATIONS

SPECIFICATION

VALUE

Rated Power, KW

250

Rated Energy Capacity, kwh

354,8

Nominal Connection Voltage (POI), kv

0,4

Nominal Frequency, hz

50

Installation Type

Outdoor, UHL1

Dimensions (L×W×H)

3810 × 6355 × 2926 mm (20 ft HC container)

Weight, t

10

Cooling System

Air cooling (HVAC + supply/exhaust ventilation)

Battery Type

Lithium Iron Phosphate (LFP)

Max Charge Rate

0,5 С

Max Discharge Rate

1 С

Cycle Life, cycles

6000

Battery Configuration

3 clusters, 1P240S

Nominal DC Bus Voltage, v

768

Power Conversion System

High-frequency modular bidirectional converter with isolation transformer

Maximum PCS Efficiency

96,1%

Total Harmonic Distortion (THD)

2%

Overload Capability

105 – 115% — 10 min
115 – 125% — 1 min
125 – 150% — 200 ms
Share your project requirements with us, and our experts will contact you shortly.